Retinoblastom - Forum

 
Sie sind nicht eingeloggt.
LoginLogin Kostenlos anmeldenKostenlos anmelden
BeiträgeBeiträge MembersMitglieder SucheSuche HilfeHilfe
VotesUmfragen FilesDateien CalendarKalender BookmarksBookmarks
KBK light load overhead crane VS traditional overhead crane

Anfang   zurück   weiter   Ende
Autor Beitrag
tai tai
Gast
New PostErstellt: 09.07.21, 04:36  Betreff: KBK light load overhead crane VS traditional overhead crane  drucken  weiterempfehlen Antwort mit Zitat  

KBK light load overhead crane VS traditional overhead crane

Reduce plant cost: The equipment does not need the help of the plant corbel, in the design of the plant, you can minimize the bearing capacity of the plant column design to greatly reduce the cost of the plant.

No need to change the plant structure: for the existing plant, it can be added at any time according to the production needs, without any modification to the original structure of the plant.

Less idle equipment: The carrying space can be covered according to the needs, and accurate shooting can be conducted to minimize idle waste of equipment.

Modular design: it can be increased or decreased according to the changing production needs. It is easy to remove and move quickly without affecting the normal use of cranes in other areas.

More accurate positioning: light and small structure, easy operation, accurate positioning

More energy-saving and environmental-friendly: small power, low energy consumption, more energy saving and environmental protection.

Low operating noise: simple structure, low failure rate, greatly reduce the scope of equipment failure.

High comprehensive benefit: the track system is maintenance-free, the electric components are maintained conveniently and the cost is low. Reduce the time and labor cost caused by equipment failure, with high comprehensive benefit. crane for sale
nach oben
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design