Retinoblastom - Forum

 
Sie sind nicht eingeloggt.
LoginLogin Kostenlos anmeldenKostenlos anmelden
BeiträgeBeiträge MembersMitglieder SucheSuche HilfeHilfe
VotesUmfragen FilesDateien CalendarKalender BookmarksBookmarks
GIS reaches high point

Anfang   zurück   weiter   Ende
Autor Beitrag
taitai
Gast
New PostErstellt: 19.09.23, 03:07  Betreff: GIS reaches high point  drucken  Thema drucken  weiterempfehlen Antwort mit Zitat  

GIS produced four 5t-capacity electric chain hoists to assist the construction of a funicular railway in the mountains of its home country of Switzerland.

The hoists were part of a customised rig used during the construction of the railway which transports passengers from Schwyz to Stoos, a mountain village in central Switzerland.

The €44.6m project covers a maximum incline of 47° and rises 744m in altitude over a distance of 1.74km. It features an automatic levelling system, which ensures passengers remain standing on a horizontal surface during the journey, and it claims to be the steepest funicular railway in the world.

The track was laid by Swiss company Rowa, a logistics services provider for tunnels, railways and other projects. Rowa devised the configuration of hoists, rigged beneath its displacement machine.

The four GCH2500/2NF hoists were used during the installation of the track sections and concrete railway structure. The hoists were used both individually and in conjunction, based on the varied shapes and sizes of the loads, up to a maximum load capacity of 6.5t.

The displacement machine weighed 60t and travelled on a temporary rail structure to lay the track at a rate of 12m a day.

Lukas Bühlmann at GIS said: “The hoists were operated by bellybox remote control. Smooth running ensured exact positioning of loads, many of which were long and bulky. The hoists, which were designed for intensive, everyday use, completed lifting tasks reliably, despite being exposed to the elements in changing weather conditions.

“Actually, once rigged, the project didn’t place over exertion on our hoists. For example, they could connect to loads by the standard hooks and pick points were readily available, even when all four hoists needed to be employed at the same time. We were honoured to be associated with such a landmark project, although we are humble and modest as to our involvement; the project was a spectacular feat of construction and engineering in its own right.”

The planning and building phase of the project spanned 14 years, and the railway has been operational since the end of December 2017.

GIS reaches high point
nach oben
yao618
Mitglied

Beiträge: 11995

New PostErstellt: 04.01.24, 05:05  Betreff: Re: GIS reaches high point  drucken  weiterempfehlen Antwort mit Zitat  

https://telegra.ph/Katana-source-11-28
http://tinyurl.com/f6jv55h5
http://tinyurl.com/57c2c8js
https://cutt.us/qKpkV
https://cutt.us/HXsqL
https://cutt.us/GXPmo
https://www.quia.com/profiles/yaoshangguan
https://profile.hatena.ne.jp/yao617/
https://peatix.com/user/20056505/view
https://musescore.com/user/74727199
https://forum.index.hu/User/UserDescription?u=1970841
https://cutt.us/jS8Xn
https://cutt.us/LFFRT
https://rb.gy/9d3jt7
https://rb.gy/81rx4d
https://rb.gy/x6u0c4
https://rb.gy/4uggap
https://rb.gy/am00r7
https://cutt.us/pbXTd
https://cutt.us/jRCL4
https://cutt.us/9MEI4
https://cutt.us/67y0R
https://cutt.us/FcVLG
http://tinyurl.com/pphpyzvb
http://tinyurl.com/b7bzv3v6
http://tinyurl.com/yc3p98v2
https://telegra.ph/Unsheathing-the-Soul-of-the-Samurai-11-28
https://yao-1.gitbook.io/the-art-of-the-katana/
https://yao-1.gitbook.io/katana-source-1/
https://yao-1.gitbook.io/unsheathing-the-soul-of-the-samurai-1/

nach oben
Benutzerprofil anzeigen Private Nachricht an dieses Mitglied senden
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design