Hoists are assisting the dismantling process at the Philippsburg nuclear power p

Anfang   zurück   weiter   Ende
Autor Beitrag
taitai
Gast
New PostErstellt: 03.08.23, 03:05  Betreff: Hoists are assisting the dismantling process at the Philippsburg nuclear power p  drucken  Thema drucken  weiterempfehlen Antwort mit Zitat  

Hoists from Stahl Crane Systems are assisting the dismantling process at the Philippsburg nuclear power plant in Germany.
Germany is currently in the process of decommissioning all of its nuclear power stations by the end of 2022, following the 13th amendment of the Atomic Energy Act in 2011.

The Philippsburg plant is operated by EnBW and is located on the bank of the River Rhine, in the south-west of Germany. Dismantling of Unit 1 of the plant began in May 2017, with the reactor in Unit 2 set to be shut down before the end of 2019.

In January 2017, EnBW contacted Innokran, a certified partner of Stahl CraneSystems, to work on installing three crane systems at the plant’s residual waste processing centre (RPC) and waste storage facility.

“We completed our first job in the power plant sector back in 2012 and have continuously expanded our experience in the field,” said Christoph Fischer, managing director of Innokran.

A frequency-controlled SHWF 8 winch from Stahl CraneSystems with a lifting capacity of 32t is being used in the RPC on a double girder overhead travelling crane with a span of 20m. The winch has a lifting speed range from 0–4m/min and is continuously variable. An auxiliary SHF 50 hoist with a lifting capacity of 5t was also installed.

The hoist power supply lines are protected by an energy chain. When the load moves downwards, the energy produced by the generator is converted into heat by the braking resistance, and is released into the environment through convection. In addition, special safety standards applicable in nuclear technology require redundant implementation of brakes and measuring systems. Some components, such as the switch cabinet, are made of corrosion-free stainless steel for easier cleaning; a paint coating is not required.

“The biggest challenge with such a plant is the complete documentation of all work processes—and also those of supplier companies. EnBW attaches great importance to this,” said Fischer. This includes marking all steel components with material stamps to ensure traceability, and all welds being inspected by an external team.

EnBW is also constructing a similar residue processing centre and waste storage facility at its Neckarwestheim site, where Innokran will supply a further three crane systems.

Hoists are assisting the dismantling process at the Philippsburg nuclear power plant in Germany
nach oben
Helenwatcher
Mitglied

Beiträge: 12366

New PostErstellt: 24.08.23, 05:26  Betreff: Re: Hoists are assisting the dismantling process at the Philippsburg nuclear power p  drucken  weiterempfehlen Antwort mit Zitat  

https://hypothes.is/users/samlordmitch
http://ceesty.com/eg6sN9
http://ceesty.com/eg6sNP
http://ceesty.com/eg6sM2
http://ceesty.com/eg6sMK
http://ceesty.com/eg6s1s
https://os.mbed.com/users/samlordmitch/
https://rebrand.ly/jealuj6
https://rebrand.ly/0987fa
https://rebrand.ly/6v22zyx
https://rebrand.ly/bn49qld
https://rebrand.ly/25b8agi
https://community.hodinkee.com/members/samlordmitch
https://cutt.ly/gwg9lYAh
https://cutt.ly/zwg9lQvB
https://cutt.ly/Swg9lx40
https://cutt.ly/pwg9lCOI
https://cutt.ly/2wg9l1pC
https://www.finegardening.com/profile/samlordmitch
https://cutt.us/aFwNZ
https://cutt.us/NCcEU
https://cutt.us/aFy3a
https://cutt.us/cNzmO
https://cutt.us/LK6Ks
http://simp.ly/p/JPklRm
https://tinyurl.com/4kta5239
https://tinyurl.com/5n6ct33f
https://tinyurl.com/mr3e3h3t
https://tinyurl.com/2dnxj728
https://tinyurl.com/4r88jtwh

nach oben
Benutzerprofil anzeigen Private Nachricht an dieses Mitglied senden
yao618
Mitglied

Beiträge: 11995

New PostErstellt: 09.01.24, 02:58  Betreff: Re: Hoists are assisting the dismantling process at the Philippsburg nuclear power p  drucken  weiterempfehlen Antwort mit Zitat  

https://issuu.com/yao617
https://plaza.rakuten.co.jp/yao617/diary/202311270000/
https://bit.ly/475AXkB
https://bit.ly/4771ldV
https://bit.ly/487DMTt
https://bit.ly/486U52X
https://bit.ly/3S1dH3b
https://plaza.rakuten.co.jp/yao617/diary/202311270001/
http://tinyurl.com/dbu5x5yn
http://tinyurl.com/3h6numet
http://tinyurl.com/5n73ysns
http://tinyurl.com/mrx8rch4
http://tinyurl.com/4m39xvn6
https://rebrand.ly/sddss
https://rebrand.ly/sdsdzzz
https://rebrand.ly/5tlxdyk
https://rebrand.ly/l80pud7
https://rebrand.ly/pfkc91i
https://plaza.rakuten.co.jp/yao617/diary/202311270002/
https://unsplash.com/@yao617
https://cutt.ly/NwDnLxZR
https://cutt.ly/7wDnLnfX
https://cutt.ly/twDnLWmM
https://cutt.ly/AwDnLIwT
https://cutt.ly/XwDnLFGP
https://cutt.us/qRq1G
https://cutt.us/oBKBl
https://cutt.us/qk0EN
https://cutt.us/kx32f
https://cutt.us/qa6Wt

nach oben
Benutzerprofil anzeigen Private Nachricht an dieses Mitglied senden
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design